Cayenne S (9PA) V8-4.8L (2010)
3. Screw on bracket at centre tunnel.
3.1. Screw in -34- fastening screws.
4. Screw parking brake to bracket.
4.1. Screw in fastening screws -30a and 30b- and tighten to the specified torque. Tightening torque: 23 Nm (17 ftlb.), Tightening torque: 23 Nm
(17 ftlb.)
5. Screw bracket to firewall.
5.1. Screw in fastening screw -29- and tighten to the specified torque. Tightening torque: 23 Nm (17 ftlb.) ± 3 Nm (±2 ftlb.)
5.2. Press in -28- cover cap -Arrow F-.
6. Screw on ground straps.
6.1. Connect ground straps -18- together with cage -17- -Arrow M-.
6.2. Screw in nuts -19- and tighten to the specified torque. Tightening torque: 9 Nm (6.5 ftlb.) ± 1 Nm (±0.5 ftlb.)