porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Cooling System|Capacity Specifications|Page 2513 > < Cooling System|Capacity Specifications|Page 2511
Page 10
background image

Information: 
 

Do not activate the 2/3 directional-control valve with the Porsche System Tester above 1500 rpm.

 

Activate the 2/3 directional-control valve with the Porsche System Tester below 1500 rpm.

3. Operate engine for 5 minutes with changing engine speeds. When doing this, run the engine for 10 seconds in idle and then for 10 seconds at 4,000

rpm. In the speed transition from higher engine speeds (1500 to 4000 rpm) to idle (approx. 600), the directional-control valve should be activated
with the Porsche System Tester below 1500 rpm. Note that the 2/3 directional-control valve is not activated with the Porsche System Tester above
1500 rpm.

4. Let the vehicle cool down.
5. Open maintenance cover.

Maintenance cover

6. Carefully open the cap on the coolant reservoir. Unscrew the cap in an anti-clockwise direction.

Cap on coolant reservoir

7. Check coolant level and, if necessary, fill the coolant reservoir with coolant to the maximum marking.

Maximum marking for coolant reservoir

8. Screw on the cover of the reservoir.

Cooling System|Capacity Specifications|Page 2513 > < Cooling System|Capacity Specifications|Page 2511