Cayenne Titanium (9PA) V8-4.5L (2006)
Bracket fastening screws
All three fastening screws
8. Fit coolant lines from oil-water heat exchanger. Push both coolant lines onto the socket piece and fit the spring-band clamps using the spring-band
clamp pliers.
Pushing coolant lines onto connecting piece
Information:
The following step must only be performed for the M48/50 (V8 Turbo) engine.
9. Fit oil return lines for turbochargers. Insert the lines into the connections and align them. Then screw in the union nuts by hand and tighten them. -
Tightening torque: 26 ftlb.