porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Cut-Off Relay|Page 411 > < Removing and Installing Cut-Off Relay|Page 409
Page 8
background image

WARNING:
Danger of personal injury if the drive link test is carried out when the vehicle is in motion! The following conditions must be observed
when carrying out the drive link test:
-

Never carry out the drive link test when the vehicle is in motion.

-

The drive link test must always be carried out on a stationary vehicle in a workshop with sufficient commercially available tools. The
driver's seat must then be partially removed in order to deactivate the cut-off relay again. Only then can the engine be restarted.

5. Follow the menu Drive links (Drive link test).

NOTE:
-

When you perform the drive link test:

-

The cut-off relay is activated. The cut-off relay must be activated again.

-

The hazard warning lights are activated.

-

The central locking system is opened.

-

Triggering of the airbag units is simulated.

6. To activate the cut-off relay: Press on the colored area of cut-off relay (located in power distributor).

7. Ignition off. Disconnect and re-connect battery
8. Read out fault memory for all control units and erase if necessary.

Carry out work instruction after disconnecting the battery.

Removing and Installing Cut-Off Relay|Page 411 > < Removing and Installing Cut-Off Relay|Page 409