porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Cut-Off Relay|Page 5351 > < Removing and Installing Cut-Off Relay|Page 5349
Page 4
background image

1. Position the cutoff relay -2- in the power distributor. Screw on the two fastening nuts -3- on the cutoff relay. - Tightening torque: 20 Nm (15 ftlb.)
2. Connect electric connector -1- to cutoff relay and lock it -arrow a-.

3. Slide cover of power distributor from front to back -arrow A- and press it on -arrow B- until the latch locks into place.

INFORMATION:  Only for vehicles with auxiliary battery

4. Attach the line for the additional battery to the threaded bolt -arrow A- and secure with the fastening nut -3-. - Tightening torque: 20 Nm (15 ftlb.)
5. Close the cover -arrow B- until the locking lugs -arrows C- engage securely.

1. Fold carpeted floor forward -arrow A-, place battery ground strap on the body -arrow B- and secure with the fastening nut -1-. - Tightening torque:

20 Nm (15 ftlb.)

Removing and Installing Cut-Off Relay|Page 5351 > < Removing and Installing Cut-Off Relay|Page 5349