porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Repair Main Wire Harness|Page 5435 > < Repair Main Wire Harness|Page 5433
Page 4
background image

(recommended accessories for the repair kit for harnesses) so that they are watertight.

10. Route main wire harness and fasten with four new tie-wraps. Shorten tie-wraps.

11. Close cover of main wire harness -B-.
12. Fold back carpeted floor -A- on the right side at the entrance.
13. If necessary after moisture leakage, place the vehicle in the drying cabin for 3 - 4 hours (overnight if necessary) at a temperature of approx 60

degrees C.

14. Fold back carpeted floor and sound absorber -A- in the front right footwell.

Subsequent work

1. Investigate the moisture leakage using the traces of water. Take into account the description "Sealing front panel".
2. Install front right seat frame.
3. Install front right side section trim.
4. Install cover under right instrument panel.
5. Carry out work instructions after disconnecting the battery.

Repair Main Wire Harness|Page 5435 > < Repair Main Wire Harness|Page 5433