9-2X F4-2.0L Turbo (2005)
About one hour after installation, conduct a water leak test.
After completion of all work, allow the vehicle to stand for about 24 hours.
NOTE:
-
When the door is opened/closed after glass is bonded, always lower the door glass and then open/close it carefully.
-
Move the vehicle slowly.