9-2X F4-2.0L Turbo (2005)
15. Remove the gear shift lever.
INSTALLATION
5MT
1. Install the joint to the transmission and secure with the spring pin.
2. Insert gear shift lever from room side.
NOTE:
After inserting rod and stay, position them onto transmission mount.
3. Lift-up the vehicle.
4. Install the joint to shifter arm.
5. Insert the spring pin.
6. Mount the cushion rubber on body.