9-2X F4-2.5L (2006)
Remove the switch panel.
Disconnect the connector.
Installation
Main Switch
Install in the reverse order of removal.
Sub Switch
Install in the reverse order of removal.
Remove the switch panel.
Disconnect the connector.
Installation
Main Switch
Install in the reverse order of removal.
Sub Switch
Install in the reverse order of removal.