saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Campaign - OnStar(R) System Software Upgrade|Page 12451 > < Campaign - OnStar(R) System Software Upgrade|Page 12449
Page 33
background image

21.

Position and fit the centre panel vent. Make sure that the catches fasten securely.

22.

Check the fit, play and functionality of the cupholder.

Initial procedure

1.

Remove fuse 23 (40A maxi fuse) from the dashboard fuse box.

Important

The battery must be charged before SPS programming. The battery charger must be able to provide 20 A.

The charging voltage for the battery charger may not exceed 16 V as the electronics in the car may be damaged.

2.

Connect the battery charger to the car battery.

3.

Connect Tech2 to the car's data link connector and to a PC with TIS 2000.

4.

Get Security Access to Tech2 from the car.

Campaign - OnStar(R) System Software Upgrade|Page 12451 > < Campaign - OnStar(R) System Software Upgrade|Page 12449