9-3 (9440) L4-2.0L Turbo (2.0 HOT) (2003)
10.
Slide in the parcel shelf trim. Make sure the lugs fully engage the mountings in the parcel shelf plate.
11.
Fit the clips to the parcel shelf trim.
10.
Slide in the parcel shelf trim. Make sure the lugs fully engage the mountings in the parcel shelf plate.
11.
Fit the clips to the parcel shelf trim.