saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Evaporator's High and Low-Pressure Pipes|Page 3486 > < Evaporator's High and Low-Pressure Pipes|Page 3484
Page 7
background image

3. Fit the high and low pressure pipe's PAD connection on the front right structural member using a new seal.

Tightening torque 15 Nm (11 lbf ft)

4. Fit the high and low pressure pipe's PAD connection to the expansion valve using a new seal.

Tightening torque 15 Nm (11 lbf ft)

Evaporator's High and Low-Pressure Pipes|Page 3486 > < Evaporator's High and Low-Pressure Pipes|Page 3484