saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 1042 > < Initial Inspection and Diagnostic Overview|Page 1040
Page 6
background image

1. Make sure the component or lead to be tested is not under tension (e.g. by removing the relevant fuse).
2. Set the multimeter for measuring ohms and connect the ohmmeter to each end of the component/lead to be tested.
3. Jiggle the relevant wiring harness while observing the ohmmeter.

Normally, the resistance of a wiring harness is less than 1 ohm. Specified values apply to components.

Testing for short circuits to ground

Initial Inspection and Diagnostic Overview|Page 1042 > < Initial Inspection and Diagnostic Overview|Page 1040