saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Description of On-Board Diagnostics|Page 6496 > < Description of On-Board Diagnostics|Page 6494
Page 8
background image

NOTE: For further information on how pins/sleeves are fitted, see Wiring harness repair.

6. If the lead is not long enough, splice it as follows:

6.1. trip the insulation off of the leads.
6.2. Fit a shrink tube with adhesive on the line.
6.3. Fit sleeve (0.5-1.0 sq.mm), using the blue pliers from 86 12 939 Tool box, wiring harness.

NOTE: Leads with 0.35 sq.mm are doubled over and crimped together at both ends.

6.4. Place the shrink tube over the sleeve.
6.5. Heat the shrink tube until it is secured.

7. Strip 4 mm of the lead's insulation.
8. Search for the connector in the spare parts catalogue/EPC to find the part number of the pin to be used.
9. Fit the pin on the lead using olive green pliers (0.35-0.75 sq.mm) from 86 12 939 Tool box, wiring harness.

10. Check that the stripped lead goes through the entire clamped portion of the pin and that the insulation is properly clamped.

Description of On-Board Diagnostics|Page 6496 > < Description of On-Board Diagnostics|Page 6494