saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 10456 > < Initial Inspection and Diagnostic Overview|Page 10454
Page 5
background image

Part 1 Of 2

Part 2 Of 2

1. Make sure there is no power being supplied to the lead to be checked (e.g. by removing the relevant fuse) and that any loads have been

disconnected.

2. Set the multimeter till ohm measurement.

3. Connect one test lead to a reliable ground and the other to the point to be checked.

4. Carefully jiggle the wiring harness and check that the multimeter shows a constant infinite value (OL).

Initial Inspection and Diagnostic Overview|Page 10456 > < Initial Inspection and Diagnostic Overview|Page 10454