saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Refrigerant|Capacity Specifications|Page 7908 > < Refrigerant|Capacity Specifications|Page 7906
Page 4
background image

Make sure that the amount of compressor oil in the A/C system is correct before vacuum pumping and filling is started.

IMPORTANT

Vacuum pumping should be performed simultaneously on the low-pressure and high-pressure sides. A non-return valve in the low-pressure inlet on the
compressor makes it impossible to vacuum pump on one side only.

1

Connect the blue low-pressure hose with a snap-on coupling to the A/C system low-pressure side.

2

Connect the red high-pressure hose with a snap-on coupling to the A/C system high-pressure side.

3

Open the valves on both snap-on couplings by turning in the knobs.

4

Open the valves for the blue low-pressure hose and the red high-pressure hose on the pressure gauge stand.

5

Open the blue valve ("Liquid") for liquid form refrigerant on the Smart Cart container.

6

Check to make sure that the valve for the yellow hose on the pressure gauge stand middle outlet is closed.

7

Programme vacuum pumping for 30 minutes by pressing "30" on the control panel in the position "Vacuum minutes". Confirm the selection by
pressing "ENTER".

Refrigerant|Capacity Specifications|Page 7908 > < Refrigerant|Capacity Specifications|Page 7906