saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Refrigerant|Capacity Specifications|Page 6912 > < Refrigerant|Capacity Specifications|Page 6910
Page 2
background image

1. Check to make sure that the valves on both the blue low-pressure and the red high-pressure hoses on the pressure gauge unit are closed.
2. Connect the blue low-pressure hose with a snap-on coupling to the A/C system low- pressure side.
3. Connect the red high-pressure hose with a snap-on coupling to the A/C system high- pressure side.
4. Open the valves on both snap-on couplings by turning in the knobs.
5. Start the engine.

At an engine speed of 1500 - 2000 rpm and an ambient temperature of 20°C, it should be possible to note the following on the pressure gauges
when the compressor is operating:

Low-pressure side: 1.5-2.5 bar

Purging with the Robinair 10324 Smart Cart and Robinair 17234 purging station

Refrigerant|Capacity Specifications|Page 6912 > < Refrigerant|Capacity Specifications|Page 6910