saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Compressor Low-Pressure and High-Pressure Pipes|Page 1824 > < Compressor Low-Pressure and High-Pressure Pipes|Page 1822
Page 7
background image

13. Lubricate the new O-rings with synthetic vaseline and fit them in both ends of the low-pressure pipe front section.
14. Connect the pipe at both ends.
15. Tighten the pipe at both ends.

Tightening torque 34 Nm (25 lbf ft)

16. Fit the evaporator low-pressure pipe in the brackets on the bulkhead and wheel housing.
17. Fit the low-pressure side service connection and press on the clip.

Compressor Low-Pressure and High-Pressure Pipes|Page 1824 > < Compressor Low-Pressure and High-Pressure Pipes|Page 1822