9-5 (9600) L4-2.3L Turbo (2007)
3. Connect the pipes to the heat exchanger and screw on the PAD connector.
Tightening torque: 3-4 Nm (2.2-3.0 lbf ft)
4. Fit the air vent to the air duct.
3. Connect the pipes to the heat exchanger and screw on the PAD connector.
Tightening torque: 3-4 Nm (2.2-3.0 lbf ft)
4. Fit the air vent to the air duct.