saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3697 > < Initial Inspection and Diagnostic Overview|Page 3695
Page 7
background image

1. Make sure the lead being tested is not under tension (e.g. remove the relevant fuse) and that any loads are disconnected.
2. Set the multimeter for measuring ohms.
3. Connect one test lead to a good ground and the other to the point to be tested.
4. Carefully jiggle the wiring harness and make sure the multimeter reading shows infinite resistance (OL) all the time.

Connectors, Handling and Inspection

Connectors, Handling And Checking

Handling

1. When detaching connectors with locks, it is essential that the lock is released before the connector is detached. Ensure the connector locks

properly when connecting.

Initial Inspection and Diagnostic Overview|Page 3697 > < Initial Inspection and Diagnostic Overview|Page 3695