9-5 (9600) L4-2.3L Turbo (2007)
Rain Sensor: Testing and Inspection
SID Module - Rain Sensor
Control Module Connection Test Values, Rain Sensor
Scope
This section contains the readings and instructions for measuring voltage levels on the SID unit.
Remember
^
Observe the conditions set for testing and use common sense when assessing the results.
^
First make sure that the control module is receiving power and that it is grounded.
^
Then check all the sensor inputs and signals from other systems.
^
Finally check the control module outputs. Remember that the test readings do not indicate whether the actuator is working.
^
If a test value is incorrect, consult the wiring diagram to trace which leads, connectors and components should be checked more thoroughly.
^
The specified test readings refer to those obtained with a calibrated Fluke 88/97.
^
The test readings show the signal's pulse ratio and pulse duration. A test instrument capable of giving pulse ratio and pulse duration readings
should be used. The sign indicates a positive trigger pulse, TRIG+.