saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 9658 > < Initial Inspection and Diagnostic Overview|Page 9656
Page 4
background image

SID Module-Lighting

Readings, Control Module Connections, Xenon Headlamps

Scope

This section contains the readings and instructions for measuring voltage levels on the SID unit.

Remember

^

Note the test conditions and use common sense when assessing the test result.

^

First check that the control module has a power supply and is grounded.

^

Then check all sensor inputs and signals from other systems.

^

Lastly, check the control module outputs. Remember, the test values do not say anything about whether or not the actuator is in working order.

^

If a reading is incorrect, consult the wiring diagram to trace the leads, connectors or components which should be checked more thoroughly.

^

The specified test readings refer to those obtained with a calibrated Fluke 88/97.

^

The test readings show the signal's pulse ratio and pulse width. A test instrument with pulse ratio and pulse width measurement must be used. The
sign indicates a positive trigger pulse, TRIG+.

Control module connection

Initial Inspection and Diagnostic Overview|Page 9658 > < Initial Inspection and Diagnostic Overview|Page 9656