9-5 (9600) L4-2.3L Turbo (2.3 T) (2006)
1. Position the high-pressure pipe in the engine bay.
NOTE: Insert the high-pressure pipe in the engine bay from the left side.
2. Remove the plugs. Replace and lubricate the O-rings on the receiver connection.
3. Press in the high-pressure pipe to the holder on the subframe.
4. Screw on the PAD connection to the receiver.
Tightening torque: 8 Nm (5.9 lbf ft)
5. Remove the plugs. Replace and lubricate the O-ring on the compressor connection.