9-5 (9600) L4-2.3L Turbo (B235) (2001)
7
Lubricate new O-rings with synthetic vaseline. Fit the O-rings on the pipes to the expansion valve.
8
Fit the A/C pipes' PAD connection to the expansion valve, 1 bolt in center.
9
Connect the 2 hoses to the heat exchanger at the bulkhead.
10
Fit the solenoid valve and holder to the bulkhead as follows:
^
Plug in the connector to the charge air bypass valve's solenoid valve and screw it to the holder, 1 bolt.
^
Fit the holder and connector to the bulkhead, 2 bolts.
^
Fit the cover on the solenoid valve.
11
Fit the pipe from the charge air cooler to the throttle body, 1 bolt