saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Front Delivery Line, Power Steering|Page 8306 > < Front Delivery Line, Power Steering|Page 8304
Page 6
background image

13. 4 cyl. petrol: Screw into place the bracket bolts before the delivery line to pump union is tightened. Screw in the delivery line pump union as far as

possible by hand, in order to guide the pipe so as to not distort the bracket. 
Tighten the delivery line union and the bracket bolts.

IMPORTANT: Make sure that the O-ring is fitted correctly.

14. 6 cyl. diesel: Screw into place the banjo nipple using new seals. Assemble the bolts and clamp band to the bracket.

Tighten the banjo nipple.
Tightening torque 30 Nm (22 ft. lbs.)

Front Delivery Line, Power Steering|Page 8306 > < Front Delivery Line, Power Steering|Page 8304