saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Procedures|Page 7007 > < Procedures|Page 7005
Page 14
background image

Connect the high-pressure pipe to the joint on the console behind the right-hand headlamp.
Tightening torque: 8 Nm (6 ft. lbs.)

12. Fit the inlet hose with mass air flow sensor.
13. Evacuate the A/C system and refill with refrigerant.

Procedures|Page 7007 > < Procedures|Page 7005