9-5 Linear (9600) L4-2.3L Turbo (2.3t) (2004)
9. Connect the 2 hoses to the heat exchanger at the bulkhead.
10. Fit the solenoid valve and holder to the bulkhead as follows:
9. Connect the 2 hoses to the heat exchanger at the bulkhead.
10. Fit the solenoid valve and holder to the bulkhead as follows: