9-5 Linear (9600) L4-2.3L Turbo (2.3t) (2004)
13. 4 cyl. petrol: Screw into place the bracket bolts before the delivery line to pump union is tightened. Screw in the delivery line pump union as far as
possible by hand, in order to guide the pipe so as to not distort the bracket.
Tighten the delivery line union and the bracket bolts.
IMPORTANT: Make sure that the O-ring is fitted correctly.
14. 6 cyl. diesel: Screw into place the banjo nipple using new seals. Assemble the bolts and clamp band to the bracket.
Tighten the banjo nipple.
Tightening torque 30 Nm (22 ft. lbs.)