9-5 Linear Sport Wagon (9600) L4-2.3L Turbo (B235) (2002)
11.
Lower the car.
12.
Check the function of the check valve on the small circuit with 30 14 883 Pressure/Vacuum pump, replace if necessary. The arrow must point
toward the throttle body.
Note
Arrow's direction on the check valve.
13.
Connect the new hose kit (with T-connection) between the nipple on the oil filler pipe and the connection on the turbo's intake manifold.
14.
Fit the insulation under the throttle body's coolant hoses so that the insulation's short sides point upward.