saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Recall - Check Valve & Banjo Bolt Replacement|Page 2883 > < Recall - Check Valve & Banjo Bolt Replacement|Page 2881
Page 3
background image

Please check your IRIS On-Line Recall & Service Campaign Inquiry for open campaigns.

Material

51 25 406 Banjo bolt
81 24 141 Gasket (x2)
93 99 973 Hose with check valve
79 71 864 Cable tie

Electronics or carburetor cleaner safe for use with oxygen sensors (see label for usage guidelines)

Tools:

Numeral 8 punch: 02 97 713
This tool can be ordered directly from Kent-Moore at 1-800-345-2233.

Procedure

Before proceeding, check box B5 of the modification identity plate. If the box is not marked, continue as follows.

M99-M00 with 4-cylinder engine within VIN Serial No. Ranges:

X3000001 - Y3015849

All steps must be carried out.

M00 with 4-cylinder engine within VIN Serial No. Ranges:

Y3015650 - Y3041906

Perform steps 1-15 only.

M00 Aero models within VIN Serial No. Ranges:

Y3000001 - Y3041906

Perform steps 1-15 only.

1

Remove the engine cover.

2

Cut off the cable tie securing the check valve to the valve cover.

3

Detach the vacuum hose from the valve cover and the throttle body.

4

Transfer the insulation sleeve from the old hose to the new.

Recall - Check Valve & Banjo Bolt Replacement|Page 2883 > < Recall - Check Valve & Banjo Bolt Replacement|Page 2881