saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Compressor High-Pressure Pipe|Page 7648 > < Compressor High-Pressure Pipe|Page 7646
Page 3
background image

10. Detach the pipe from the receiver and plug the openings.

IMPORTANT
If the desiccant container has been open for more than 15 minutes in total, it should be changed.

11.  Loosen the pipe from the holder on the subframe and remove it.

To Fit

Compressor High-Pressure Pipe|Page 7648 > < Compressor High-Pressure Pipe|Page 7646