saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Refrigerant|Capacity Specifications|Page 1896 > < Refrigerant|Capacity Specifications|Page 1894
Page 3
background image

1. Using a snap-on coupling, connect the blue low-pressure hose to the low-pressure side of the A/C system.
2. Using a snap-on coupling, connect the red high-pressure hose to the high-pressure side of the A/C system.
3. Open the valves on both snap-on couplings by screwing in the knobs.
4. Using the yellow hose, connect the pressure gauge stand middle outlet to the draining station.
5. Open the valves on the blue low-pressure hose and the red high-pressure hose as well as the valve on the yellow hose connected to the pressure

gauge stand middle outlet.

6. Open the blue valve ("Liquid") for liquid refrigerant and the red valve ("Gas") for gaseous refrigerant on the draining station container.
7. Start the draining station. When draining is finished, the draining station will switch off automatically.
8. Close the valves on the blue low-pressure hose, the red high-pressure hose and the yellow hose connected to the pressure gauge stand middle

outlet.

9. Remove the yellow hose from the draining station. Draining has now been completed and work on the A/C system can commence.

Vacuum Pumping And Filling Of Refrigerant

Adjust the amount of compressor oil in the A/C system before commencing vacuum pumping and filling of refrigerant.

Refrigerant|Capacity Specifications|Page 1896 > < Refrigerant|Capacity Specifications|Page 1894