9-5 Sport Wagon (9600) L4-2.3L Turbo (B235) (2003)
7. Programme 30 minutes vacuum pumping by pressing "30" on the control panel in position "Vacuum minus".
8. Press "REV.PROG."
9. Press "0.87" to indicate the amount of refrigerant (in kilograms) to be refilled.
Confirm the selection by pressing "ENTER".
10. Press "REV.PROG."
11. Press "START" to start vacuum pumping.
12. Move the A/C hoses slightly and make sure that there are no leaks in the system.
The pressure must not increase more than 10 bar for 5 minutes.