9-5 Sport Wagon (9600) L4-2.3L Turbo (B235) (2003)
Tightening torque: 8 Nm (5.9 lbf ft)
2. Fit the pressure regulator vacuum hose.
3. Screw in the two rail retaining screws.
4. Fit the wiring to the fuel rail.
5. it the following connectors: ignition discharge module, injectors, manifold absolute pressure sensor, mass air flow sensor and turbo pressure
sensor.
IMPORTANT: Make sure the connectors are fitted to the correct injector, the cables are marked. Spray all the connectors with Kontakt 61 (part
no. 30 04 520) before plugging them in.
6. Fit the wiring holder.
7. Screw in the rear screw.
8. Tighten the front screw.
9. Connect the hose and fit the hose clips.
10. Tighten the turbocharger delivery pipe retaining screw on the cylinder head.