saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Bus Signals, PSM|Page 13343 > < Bus Signals, PSM|Page 13341
Page 11
background image

+30
Power +30 is supplied via fuse 25 to control module pin 6.

+15
Power +15 is supplied via fuse 27 to control module pin 1.

Grounding

The control module is grounded via pins 3 and 7.

Diagnostics

If the +30 power supply to the control module is missing, the seat cannot be adjusted in any direction.

If the +15 power supply to the control module is missing, the seat can be adjusted if one of the front doors is open.

No diagnostic communication is possible if the power supply is missing.

Bus Signals, PSM|Page 13343 > < Bus Signals, PSM|Page 13341