saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 73 > < Initial Inspection and Diagnostic Overview
Page 2
background image

1. Engage the load.
2. Set the multimeter to voltage measurement and connect its minus cable to a good grounding point.
3. Connect the voltmeter positive cable to the point where the voltage is to be tested.
4. On the output side of a switch/control module, it is best to start there and then gradually move out towards the load.

The break point in the circuit has been passed when the voltage disappears.

5. On the input side of a switch/control module/consumer, it is best to start at the closest point to the power source (often the fuse) and then gradually

move towards the switch/control module/consumer.
The break point in the circuit has been passed when the voltage disappears.

Measuring resistance to check for open circuits

Initial Inspection and Diagnostic Overview|Page 73 > < Initial Inspection and Diagnostic Overview