9-7X L6-4.2L (2008)
7. Tighten the accumulator retaining nut.
Tighten the nut to 4.5 Nm (40 in. lbs.).
8. Install the I/P carrier. Refer to Instrument Panel Carrier Replacement (See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Instrument Panel Carrier Replacement).
9. Evacuate and recharge the A/C system. Refer to Refrigerant Recovery and Recharging (See: Service and Repair/Refrigerant Recovery and
Recharging).
10. Leak test the fittings of the components using the J 39400-A.
11. Refill the engine coolant. Refer to Cooling System Draining and Filling (LL8) (See: Engine, Cooling and Exhaust/Cooling System/Service and
Repair/Cooling System Draining and Filling)Cooling System Draining and Filling (LH6) (See: Engine, Cooling and Exhaust/Cooling
System/Service and Repair/Cooling System Draining and Filling).