9-7X V8-5.3L (2005)
11. Install the PCV hose.
12. Connect the electrical harness clips to the fuel rail.
13. Connect the following electrical connectors:
*
EVAP purge solenoid (3)
*
Throttle body harness (5)
*
MAP sensor (2)
*
Main coil (1)
*
Generator (4)