saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Air Leakage, Sealing|Page 4076 > < Air Leakage, Sealing|Page 4074
Page 2
background image

10. Suspend the electrical distribution box in position and fit the wiring harness cable tie to the heater housing.
11. Place the combined instrument on the steering column bracket.
12. Place the facia in position and do up screws. Make sure that the facia is guided into the groove on the guide lug.
13. Screw the combined instrument into position.
14. Connect cables to loudspeakers.

15. Fit air ducts to left-hand and right-hand facia vents.
16. Using a cable tie, secure the wiring harness to the left-hand air duct. 
17. Fit the screws securing the left-hand and right-hand side defroster ducts.
18. Fit the instrument panel facia vent to its hose.
19. Plug in electrical connectors to instrument panel.
20. Fit the center facia vent and hose.

Air Leakage, Sealing|Page 4076 > < Air Leakage, Sealing|Page 4074