saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Canister Purge Control Valve|Specifications|Page 2313 > < Canister Purge Control Valve|Specifications
Page 1
background image

Canister Purge Control Valve: Testing and Inspection

Checking the EVAP Canister Purge Valve 

 

Tool:

-  Pressure/vacuum pump 30 14 883 

LH 2.4, 2.4.1, 2.4.2 

1  Disconnect the hose from the purge valve at the intake manifold. Connect pressure/vacuum pump 30 14 883.

2  Pump up the pressure. The non-return valve for the turbo pressure should seal.

3  Build up negative pressure. The purge valve should be:

Open with ignition switched off Closed with ignition switched on

4  If it is not, check the hose. If it is OK, change the purge valve.

 
 

LH 2.2 

1  Disconnect both hoses from the purge valve at the intake manifold.

Pump up pressure in both hoses simultaneously. The valve should be airtight.

2  Build up negative pressure in the thick hose. The valve should be airtight.

3  Build up negative pressure in the thin hose. The valve should now be open to vacuum in the intake manifold (through the thick hose).

4  If it is not, inspect the hoses. If they are OK, change the EVAP canister with purge valve.

Canister Purge Control Valve|Specifications|Page 2313 > < Canister Purge Control Valve|Specifications