9000 CDE V6-2962cc 3.0L DOHC (B308) (1995)
Pinion Gear: Service and Repair
Removal
NOTE: Component identifier numbers used in the following illustrations relate to specific steps in the procedures below.
NOTE:
^
Before the gearbox is dismantled:
^
the oil in the gearbox should be drained
^
the reversing light switch should be removed to prevent it from being damaged. Cover the hole for the switch.
^
the speedometer drive should be removed by removing the screw.
^
After the outside of the gearbox has been cleaned, work should commence as follows:
1. Place the gearbox in a stand with holder tool No. 87 92 228, or equivalent.
-
Cover the holes for the differential.
2. Remove the inner actuator shaft by first removing the four securing screws.