saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Deployment For Scrapping Purposes|Page 5115 > < Deployment For Scrapping Purposes|Page 5113
Page 4
background image

Belt tensioner, passenger side
14

Fold the carpet away from the bulkhead partition on the passenger side.

15

Run the wiring (one blue/white and one yellow/white lead), along the bulkhead partition, up to the cable channel by the wheel housing. Tape the
wiring to the bulkhead partition.

16

Fit the new wiring in the cable channel together with existing wiring.

17

Undo the bolt securing the belt roller and belt tensioner.

18

Run the wiring behind the belt tensioner together with existing wiring.

19

Plug in the connector to the belt tensioner.

20

Tie the wiring to existing wiring using cable ties.

Fuse
21

Run the fuse lead (green/white) along existing wiring as far as the fuse holder. Tie the lead to existing wiring and the air vent above the SRS
control module using cable ties.

22

Remove fuse 4 from the fuse holder.

Note :

Connect a buzzer between sleeve 5 in the SRS connector and the sleeves in fuse 4. The buzzer sounds when it is connected to one of the
sleeves in the fuse holder. Remove the sleeve that "buzzes".

23

Cut the sleeve from the lead and insulate the lead.

24

Connect the new sleeve on the spare cable assembly to the fuse.

25

Refit fuse 4.

Deployment For Scrapping Purposes|Page 5115 > < Deployment For Scrapping Purposes|Page 5113