saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Saab Information Display (SID)|Page 9982 > < Saab Information Display (SID)|Page 9980
Page 4
background image

Power Supply

The SID unit is supplied with +30 power on pin 15 and +15 power on pin 9.

When the ignition is switched on the SID unit is fully operational.

When the ignition is switched off and the audio system is on, only the CHECK systems are inoperative.

When the ignition and audio system are switched off, only the following systems are operative.

-

Time check

-

Clock setting

-

Acoustic signals time alarm

-

Outside temperature

-

Communication with other systems

When the ignition, audio system and ACC are switch off, only the following systems are operative:

-

Time check

-

Clock setting

-

Acoustic signals

-

Time alarm

When the ACC assumes parking mode, the SID unit is "woken up" via pins 16 and 17.

This is to enable the SID unit to provide an outside temperature reading.

"Engine Off" time

When the ignition is switched on, the SID unit calculates how long the engine has been switched off (max. 25.5 hours).

This information is made available to other systems via pins 16 and 17.

Saab Information Display (SID)|Page 9982 > < Saab Information Display (SID)|Page 9980