900 SE Convertible V6-2498cc 2.5L DOHC (1995)
High Pressure Sensor / Switch: Service and Repair
Installation
NOTE: In hot-climate markets the A/C system is fitted with two pressure switches.
1. Hot-climate markets: Lubricate a new 0-ring (C) with synthetic vaseline and install it in place on the receiver. Screw the pressure monitor (B) in
place and plug in the connector.
2. Lubricate a new 0-ring (D) with synthetic vaseline and install it in place on the receiver. Screw the three-stage pressure switch (A) in place and
plug in the connector.
3. Fill up with compressor oil, carry out vacuum pumping of the A/C system and fill up with refrigerant.