900 SE Convertible V6-2498cc 2.5L DOHC (1995)
-
Repeat three to four times.
-
Grip hold of the balancing spring and give it a small jerk to remove any play.
5. Install the following:
-
The air duct to the air dispenser on the instrument panel.
-
The ICE control unit
-
The fuse board
-
The knee shield
-
The floor air duct
-
The bottom part of the instrument panel
-
The data link connector