saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Technician Safety Information|Page 8481 > < Technician Safety Information|Page 8479
Page 7
background image

12. Close the cocks on the blue low-pressure hose and red high-pressure hose on the pressure gauge stand.
13. Remove the yellow hose from the draining station. Draining is now finished and work on the A/C system can commence.

Robinair 17644 Draining Equipment And Robinair 10094 Vacuum Pump - Vacuum Pumping

1. Using a snap-on coupling, connect the blue low-pressure hose to the low-pressure side of the A/C system.
2. Using a snap-on coupling, connect the red high-pressure hose to the high-pressure side of the A/C system.
3. Open the valves on both snap-on couplings by screwing in the knobs.
4. Connect the yellow hose on the pressure-gauge stand's middle outlet to the refrigerant flask.
5. Open the cocks on the blue low-pressure hose and red high-pressure hose on the pressure-gauge stand.
6. Start the vacuum pump
7. Open the vacuum valve and let the pump run for 30 minutes.
8. Close the vacuum valve when vacuum pumping is finished after about 30 minutes. The pressure should then be 0-10 mbar.
9. Switch OFF the pump.

10. Move the A/C hoses slightly and make sure that there are no leaks in the system. The pressure must not increase by more than 10 mbar in five

minutes.

Technician Safety Information|Page 8481 > < Technician Safety Information|Page 8479