saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Oil Cooler, Engine|Removal|Page 2825 > < Oil Cooler, Engine|Removal|Page 2823
Page 2
background image

6. Install the ignition coil bracket and the ignition coil.

-

Plug in the camshaft position sensor connector and the oxygen sensor connector.

7. Install the coolant bridge, radiator hose and electric connectors and tighten to: 30 Nm (22  ft. lbs.).
8. Position a new gasket and install the lower section of the intake manifold.

-

Tighten the bolts in a circular sequence to: 20 Nm (15  ft. lbs.).

9. Install the centre intake manifold with fuel rail and tighten to: 20 Nm (15  ft. lbs.).

10. Install the fuel lines.
11. Install the intake manifold.

-

First install the following:
-

The hose to the EVAP canister purge valve.

-

The coolant hoses to the throttle body

-

The throttle connector

-

The Traction Control System (TCS) throttle body connector

-

The Idle Air Control (IAC) valve connector

-

The hose to the fuel pressure regulator.

NOTE: Make sure that the pressure regulator's vacuum hose is connected to the front nipple on the throttle housing (in front of the
butterfly).

-

Tighten all bolts at the mating surface.

-

Begin with the bolts in the middle and continue alternately towards the ends.

-

Tighten to: 20 Nm (15  ft. lbs.).

Oil Cooler, Engine|Removal|Page 2825 > < Oil Cooler, Engine|Removal|Page 2823