Astra L4-1.8L (2009)
33. Install the bolt.
Connect the 2 shield, battery carrier.
34. Install the battery holder and tighten the bolt to 7 Nm (62 lb in).
35. Connect the battery.
Connect the positive cable.
Connect the ground cable.
36. For programming procedures, refer to Control Module References (See: Testing and Inspection/Programming and Relearning).