ION L4-2.2L VIN F (2004)
INSTALLATION PROCEDURE
1. Install new seal washers to the evaporator core fittings.
2. Install the TXV.
3. Install the TXV bolts.
NOTE: Refer to Fastener Notice in Service Precautions.
Tighten
Tighten the bolts to 7 N.m (62 lb in).
4. Install new sealing washers on the condenser tube and evaporator hose fittings.
5. Install the condenser tube and evaporator hose to the TXV.
6. Install the TXV nut.