ION L4-2.4L (2007)
1. Position the trim panel to the front door.
2. Engage the inner belt molding over the door flange and press down.
3. Align the trim panel retainers and press until the retainers are fully seated.
Notice: Refer to Fastener Notice.
4. Install the screw to the door trim panel.
Tighten the screw to 2.5 N.m (23 lb in).
5. Install the push-in retainers to the door trim panel.
6. Install the pull cup.
7. Install the power door lock switch.
8. Install the window regulator handle to the door.
9. Install the upper trim panel.
Front Side Door Water Deflector Replacement
Front Side Door Water Deflector Replacement
Removal Procedure